Non-Transmission Alternatives Study

Project

SCOPE: Prepare an analysis of alternatives to a proposed transmission solution and provide an expert report and testimony in application for state siting approval.

Region(s)

Northeast

Maine

Client Type(s)

SCOPE: Perform a non-transmission alternatives assessment and conduct economic benefits assessments for the Company’s certificate of public convenience and necessity application for this $1.5 billion transmission project. Develop combinations of alternatives to the transmission project that could address the identified reliability needs, and compared financial and economic performance of those resource options to the proposed transmission upgrades. Evaluate the economic impacts of the transmission and alternative solutions on state and regional market prices and Maine’s wind energy development policy. Provide expert testimony associated with the findings of the study.

SERVICES: Conducted the alternatives planning studies as input to the planning for the proposed project. Presented initial and supplemental reports in filings with the Maine Public Utilities Commission. Mr. Daniel Peaco and Mr. Richard Hahn offered oral testimony before the Maine Public Utilities Commission.

Related Projects
Non-Transmission Alternatives Study

Northeast, Vermont

SCOPE: Prepare an analysis of alternatives to a proposed transmission solution and provide an expert report and testimony in application for state siting approval.

Non-Transmission Alternatives Study

Northeast, New England

SCOPE: Assist the regional-state committee work with regional stakeholders to develop a planning framework for non-transmission alternatives studies to be conducted within the region.

Transmission Developer Qualification

Southeast , Florida

SCOPE: Evaluate qualification applications from competitive transmission developers for compliance with established reliability coordinator requirements.

Integrated Resource Plan

Northeast, Vermont

SCOPE: Conduct an evaluation of the performance of potential power portfolios to meet long term needs using scenario and sensitivity analysis. Present the results in expert testimony.

Aging T&D Replacement Plan

Midcontinent North, Indiana

SCOPE: Provided technical assistance with the review of an accelerated long-term electric capital replacement program, including aging assets.

Natural Gas System Planning

West , Washington

SCOPE: Evaluate and prepare expert testimony on a utility’s plans for LNG storage to serve system needs and requirements associated with proposed special contracts.